04-01-2018
Work is underway to finish the new building of the A. M. Qattan Foundation (AMQF) in the Al-Tira neighbourhood, Ramallah. Installation of glass and aluminium panels has reached its final stages.
On the outer walls, vertical aluminium panels that reduce sunlight exposure have been installed. Work has also been initiated to install aluminium panels to cover concrete walls.
Electrical panels and cabinets are now in place. Toilet facilities have all been tiled. Most ceilings have been installed.
Work is going on to install glass panels on courtyards, corridors, staircases and some facades. Pathways leading to the garage from the southern street are also being paved.